Hazeltine Parking Garage
Hazeltine Parking Garage was one of the first projects for TWS. This project consisted of the removal and replacement of an asphalt overlay waterproofing system. Concrete sidewalks were removed and replaced, the existing waterproofing system was removed and replaced. The system was tested with EFVM (electric Field vector mapping) for quality control, and then the new special mix asphalt was installed. The parking structure has remained watertight and is able to provide the owners with valuable parking space.